Another Christmas project, these slippers were knitted from a Fiber Trends pattern. Knitted and fulled projects are by far my preferred knitted projects. (How's that for redundancy?) I am not one to sit, nightly, knitting the same project for a year. -- I am all about instant gratification, with an element of surprise added. Fulling provides both, since I knit double-strand with large needles (I completed one slipper in about 3 hours.), and then throw the project in the washing machine in hot water and wait to see the results. This one was quite the surprise, as no project has shrunk this quickly on me before!
Here are the slippers, before fulling:
At about 12 1/2 inches in length, the slippers make my feet look like they're swimming!
After one wash cycle (It usually takes at least three cycles.), they were nearly too small, so I dried them over a hard-soled slipper to stretch them back out a bit. Now they'll fit about perfectly.
They shrank a full two inches, down to 10 1/2 inches!
And now my daughter has informed me that the slippers I knitted and fulled for her two years ago are much too small, and she wants me to make her a new pair just like the last.
My local craft store is going out of business, so my daughter and I went and bought yarn for her new slippers. They're slightly different, but I think she'll be pleased with the results, as they're her favorite color.